Norrpoint

High-precision 3D LiDAR scanners and point cloud software powered by FJDynamics in Sweden.

Norrpoint is operated by Elemtech ABElemtech AB | Org.nr: 559435-4572Glöstorps Röseväg 13, 417 45 Göteborginfo@norrpoint.se

LiDAR Scanners

  • All Scanners
  • FJD Trion P2
  • FJD Trion S2
  • FJD Trion T1

Software

  • FJD Trion Scan Field App
  • FJD Trion Model PC
  • FJD Trion Model Web

Resources

  • Buying guide
  • Industries
  • Case studies
  • Blog

Company

  • Contact Us
  • Support and services
  • Request a quote

© 2026 Norrpoint (Elemtech AB). All rights reserved.

  • Privacy Policy
  • Legal notice
Software
LiDAR Scanners
Knowledge
Contact
  1. Home
  2. /
  3. Case studies
  4. /
  5. Scan-to-BIM before demolishing a factory

Case studies

Scan-to-BIM before demolishing a factory

28 July 2023
  • S1

An abandoned factory was scanned floor by floor with the FJD Trion S1 in about five hours. Trion Model produced plans in half an hour; BIM in Revit took about two. Nine times more efficient than distance meters.

Floor plan and point cloud from a factory scanned with the FJD Trion S1

BIM is increasingly used in demolition and deconstruction as well: as-built instead of outdated 2D drawings, labels on reusable parts, and a sequence that can be shown in 3D. Without a dense record of what is still standing, the models are guesswork.

In this job an abandoned factory had to be surveyed to calculate demolition volume and build BIM. The FJD Trion S1 was carried floor by floor after a loop-closure path. Live preview in FJD Trion Scan showed gaps while walking.

From five hours on site to BIM the same day

  • Scan: about 5 hours
  • Clean-up and stitching in Trion Model: about 30 minutes
  • 2D plans (DXF) from automatic contours: about 30 minutes
  • Walls, beams, and columns in Revit: about 2 hours
2D map and floor plan from the factory scan with the FJD Trion S1
2D map and floor plan from the same cloud, produced in FJD Trion Model.

Against laser distance meters the workflow was nine times more efficient. Relative error stayed within 5 cm, enough for demolition and as-built filing. The cloud was archived as the building’s permanent record for later collaborators.

Summarised from a customer story published by FJD Trion (Opens in a new tab). Contact Norrpoint for the S1 and scan-to-BIM.